Now back at Yelvertoft, my narrowboat gets taken out of the water so that I can tackle the rusty gas locker properly, using Fertan rust treatment followed by red oxide primer, bilge paint and then two coats of Intertuf 16 blacking for good measure.
Not content with my “patch it and hope” painting of the rusty spots along the gunwales of my canal boat as seen in the last episode, I decided to try to do it properly. This did not entirely come to fruition, as I explain in this video.
At long last the time has come for the excellent Justin Green of JG Marine to visit the boat and do lots of work on it including an engine service (oil, oil filter, air filter, fuel filter etc), add the Adverc charge controller, change the old engine mounts and much more.
It’s now 3 weeks since the narrowboat became properly mine and yet I’m still not aboard and still not afloat. It’s OK, there are various reasons for this. I knew it would take a little time. Oh my, but it’s very frustrating!